  通风管道及部件的安装,土建工程应根据风道安装及暗安装条件,有必要有一定条件进行。表面安装或技能夹层内管道安装,部分应安装在通风管道工程和建筑完成或受到审查,画完成,将来如果通风管安装后,山东通风管道土木工程技术人员和其他操作,可能会损坏通风管,空气净化系统,特别是会使管道污染。对于安装暗色安装管道,应及时配合土建施工,否则会损坏土建装修吊顶、墙面。
  The installation of ventilation pipes and components should be carried out in accordance with the conditions of installation of ventilation pipes and dark installation, and it is necessary to have certain conditions. Surface installation or skill installation of pipeline in sandwich should be partly installed in ventilation pipeline engineering and construction, or be examined and painted. In the future, civil engineering technicians and other operations of Shandong ventilation pipeline may damage ventilation duct, air purification system, especially the pipeline pollution if the ventilation duct is installed. For installation of dark pipes, civil construction should be coordinated in time, otherwise the ceiling and wall of civil decoration will be damaged.
  在施工过程中,特殊人员应该分配给密切合作与土木工程根据土木工程的时间表,以保证预埋件预留孔和铺设,以避免材料的浪费,对土木工程的质量的影响。上班前一季度的安装和安装之前管道系统安装前准备工作,应进一步验证管和回(行)风口轴线和标高、等符合设计图纸,并查看公民预留洞、预埋件的方向符合需求,根据施工计划决定安排劳动力,和预制分支,悬挂,支架,风管按照施工顺序安排运到现场。
  During the construction process, special personnel should be allocated to cooperate closely with civil engineering according to the schedule of civil engineering, in order to ensure the pre-embedded parts reserved holes and laying, in order to avoid waste of materials and the impact on the quality of civil engineering. Before the installation and installation of the pipeline system in the first quarter of work, the preparatory work before installation should further verify that the axis and elevation of the pipe and return (line) tuyere meet the design drawings, and check the direction of the reserved holes and embedded parts for citizens to meet the requirements. According to the construction plan, the labor force, prefabricated branches, suspensions, brackets and ducts should be arranged according to the construction plan. Sequence arrangement for delivery to site.
山东通风管道
  同时,施工辅助材料(螺栓、螺母、垫片和粘合剂、密封剂等)和必要的安装材料也都准备好了,根据工作量和系统的多少节进行安装。
  At the same time, construction auxiliary materials (bolts, nuts, gaskets and adhesives, sealants, etc.) and necessary installation materials are also prepared, according to the workload and the number of sections of the system for installation.
  可安装风管需要的东西有:扳手、钢丝钳、螺丝刀、钢锯、锤子、扁凿、冲头、锤子、钢带、水平仪、滑轮、麻绳等。
  The first things needed to install the air duct are wrenches, wire pliers, screwdrivers, steel saws, hammers, flat chisels, punches, hammers, steel belts, levelers, pulleys, hemp ropes, etc.